Enroll — $197
FOR ASPIRING OPERATORS, FRANCHISE CANDIDATES & SBA APPLICANTS

The Hospitality Build-Out Roadmap. Get open on time, on budget, without the $30,000 surprises.

The only course built by someone who has actually opened dozens of locations — on both sides of the lease table. 5 video modules. 6 professional toolkits. A 16-week opening system.

5
VIDEO
MODULES
6
PROFESSIONAL
TOOLKITS
16
WEEK OPENING
SYSTEM
LIFETIME ACCESS
LET'S BE DIRECT

Most first-time operators over-invest in the look and under-invest in the infrastructure.

They sign a lease before the contingency account is funded. They hire a GC based on the lowest bid without running a single reference check. They submit an incomplete permit package and lose four weeks waiting for plan check rejection. They design a kitchen that looks great on paper and creates a collision zone in real service.

Then they wonder why the costs exploded.

Industry change order averages run 12–18% of total project cost. On a $300,000 build-out, that is $36,000–$54,000 in unplanned spending. That is not bad luck. That is a planning failure.

The operators who open on budget aren't smarter than you. They follow a system. This is the system.

WHAT'S INSIDE THE COURSE

Five modules. Every phase. All the tools.

01

Strategic Planning & Budgeting

The framework for building a construction budget that survives contact with real bids. Full Construction Budget Template (three-part), Essential vs. Aesthetic Audit, 20% Contingency Calculator, Scaling Law for repeatable materials, and the four-phase Milestone Budget Approval Tracker.

02

Project Team Assembly

Vet, select, and contract every professional on your team — GC, Architect, MEP subs, consultants. Standardized GC Bid Form (full CSI division breakdown), Sample RFP, Contractor Vetting Scorecard (weighted, 8-criterion), Architect Hospitality-Readiness Checklist, and the two-page Reference Check Log.

03

Value Engineering & Design

Where to spend. Where to cut. The 3-Foot Rule visual framework, Cockpit Kitchen Design Principles, Equipment Buy vs. Lease Analysis Matrix, Material Durability Matrix (tile vs. polished concrete vs. LVT), and the complete BOH and FOH Value Engineering Checklists. Yields 8–15% total cost reduction.

04

Construction & Permitting

The 16-week store opening system — week-by-week milestones, responsible parties, and status tracking from site selection through grand opening. Includes Pre-Inspection Health Code Checklist, Permit Package Assembly Guide (architectural, MEP, fire/life safety), and the full Owner Milestone Tracker.

05

Procurement & Negotiation

Stop paying retail. Supplier Comparison Sheet (weighted, 8-criterion), Owner-Furnished Equipment Tracker, Contract Negotiation Checklist (six categories with sample Liquidated Damages clause), Net Terms Negotiation Script (four-step conversation guide), and the $50K Savings Audit Worksheet.

BUILT FOR
  • You are preparing to open your first food and beverage location — restaurant, café, quick service, or franchise unit.
  • You are a franchise candidate in the pre-opening phase and need to understand what the franchisor's opening checklist doesn't cover.
  • You have an SBA loan approved or in application and need to demonstrate a credible build-out plan.
  • You graduated from culinary school with a concept and need a construction and procurement framework.
  • You are a second-career entrepreneur committed to not paying the "Inexperience Tax."
NOT FOR
  • ×
    You have 10+ years of hospitality operations and have personally managed multiple build-outs. You are not the audience.
  • ×
    You are looking for inspiration or motivation content. This is an operational system.
YOUR RESULTS

What changes when you follow this system.

WITHOUT THE ROADMAP
You submit an incomplete permit package. Plan check rejects in three weeks. You lose a month. Your carry costs burn $15,000 in rent and utilities while construction sits idle.
WITH THE ROADMAP
You submit a complete permit package on the first submission using the Permit Assembly Guide. You pass plan check. You stay on schedule.
WITHOUT THE ROADMAP
You pick the lowest GC bid. The contractor uses their own form, hides scope items, and stacks $28,000 in change orders over the first six weeks.
WITH THE ROADMAP
You issue the Standardized GC Bid Form. Every contractor bids on your terms. You compare line items directly. Scope creep is eliminated before the contract is signed.
WITHOUT THE ROADMAP
You over-allocate to aesthetics — custom millwork, bespoke lighting — and run short on HVAC, plumbing, and grease trap infrastructure. You fail your first health inspection. Opening delays six weeks.
WITH THE ROADMAP
You run the Essential vs. Aesthetic Audit before a dollar is committed. Your essentials are fully funded. Your contingency is intact. You open.
WHO CREATED THIS

Built by someone who has sat on every side of the table.

The 123 Executive Hospitality Build-Out framework was developed through direct experience as Tenant, Franchisor, and Executive — across dozens of global locations, multiple concepts, and multiple formats.

This is not academic content. Every tool in this document has been used in the field to control budgets, vet contractors, navigate permit offices, and open locations on time and within capital constraints.

GET THE FREE STRESS TEST — INSTANT DOWNLOAD

Ten minutes could save you six figures.

Enter your details. We'll send the Stress Test straight to your inbox.

No spam. No pitch. Just the tool. Occasional updates from 123 Executive.
FINAL WORD

You're going to spend six figures building this location.

The Stress Test takes 10 minutes and costs nothing. If it surfaces one gap in your plan — one contingency you missed, one GC question you forgot to ask, one permit requirement you didn't know about — it will save you more than you can imagine.

DOWNLOAD THE FREE STRESS TEST →